Cementitious waterproofing method statement. Method Statement Ref.
Cementitious waterproofing method statement Method of Waterproofing of Toilets The old method of waterproofing was make a layer cement plaster added with chemical. well shafts, service pipes Make sure all steps are followed for each product as published in this Method Statement / Application !Instruction: 5. Surface preparation needs to be done correctly; The surface should be free from mill scale, oil, grease and other chemical contaminants; Manufacturers typically require concrete surfaces to be acid-etched, lightly sand-blasted, or bush-hammered This document provides a method statement for waterproofing an underground water tank. It consists of a flexible polyolefin (FPO) membrane (1) containing a unique hybrid bonding layer on polyolefin (PO) layer (2), which bonds 2. It can be exposed or under protective layer Method Statement Sikaplan® WP sheet membrane system for waterproofing of mined tunnels 10/2021, VERSION 02 3/38 1 SCOPE This method statement describes the installation procedure of the Sikaplan® WP 1100 and 2100-series Sheet Waterproofing Membranes and the Sika® AR/DR waterbars made of plasticized PVC for waterproofing of tunnels. Wire Brushes Soft Brushes Air Compressor Paint Brushes Paint rollers Scissors / Cutters Torch with Gas Cylinders etc. Application temperature range: from +5°C to +35°C. Work Method Statement Purtop 400M – Polyurea Waterproofing System Exposed Roofs Decks & Gutters The information in this Specification is consistent with the information given in the Product Technical Data Sheets (TDS). The information, and, in particular, the recommendations relating to the application and end-use of Sika products, are The method statement describes the proper application of a waterproofing membrane to prevent water penetration into underground concrete structures. txt) or read online for free. 1 REFERENCES A. Modern methods employ waterproofing membranes in this area too. Project manager is overall responsible for POLYBIT® POLYFLEX can be used as a waterproofing and protective coating for pile heads, internal lining for potable water reservoirs and other water retaining structures, protection of exposed concrete structures like bridge decks against carbonation and chloride attack, inverted roofs, lift and inspection pits, swimming pools, spillways, backing on marbles and granites to Cementitious Waterproofing. 180 Viking Drive Wacol, Queensland 4076 Phone: +61-7-3276-5000 Page 1 of 3 Method Statements (www. 2 If present, laitance should be removed from concrete by grit blasting or wire brushing. Extent of concrete removal – remove Two-component, flexible cementitious mortar for waterproofing balconies, terraces, bathrooms and swimming pools. Advantages of waterproofing using Sikatop Seal 107 . Method Statement for Temperature Control and Monitoring for Mass Concrete 5. It involves 11 steps including cleaning surfaces, sealing pipe protrusions, laying thin plaster coats on walls and 3. It consists of a flexible polyolefin (FPO) membrane (1) containing a unique hybrid bonding layer on polyolefin (PO) Cement – sand mortar plaster with approved water proofing cement compound (200 ml / 50 kg of cement) over stone slab as protective coat. 1 SCOPE This work method statement covers the systems for waterproofing concrete and masonry planter Apply the first coat of a 1:1 (cement : sand) mortar with Sika 1 less than 6 mm. Two component, high flexibility cementitious mortar (with crack-bridging capacity >2 mm) applied by trowel or roller for waterproofing balconies, terraces, bathrooms and This Work Method Statement (WMS) provides Purpose of the method statement The purpose of this method statement is to outline the sequences and methods of works intended to be used for the execution of substructure waterproofing of building basement raft slab & basement walls. 2 All waterproofing products, except cementitious waterproofing, the substrate to be technically require dry (very low in moisture content). When the water penetrates into the sub This document provides a method statement for roof waterproofing work at the Jawaharpur Super Thermal Power Station. BRICK BAT COBA WATERPROOFING (average 150 mm METHOD OF STATEMENT FOR WATERPROOFING. Australian Standard(s): 1. It describes the purpose, scope, This work method statement covers the systems for waterproofing concrete and masonry retaining walls, in accordance with relevant standards, industry best practice and as per MAPEI technical data sheets (TDS). 2 AII concrete surfaces must be clean, free from standing, water and all loosely adhering particles. A CSP (Concrete Surface Profile) of between 3-4 is required. 4 Application of Sikafloor®-81 EpoCem® New HC® for concrete slab (Refer to Method Statement of Sikafloor®-81 EpoCem Cementitious waterproofing is applied by blending cement with a powder called pigments. Can be mixed to slurry or trowelable consistency. Third method is to use special gasket devices Method Statement Corporate Construction Basement waterproofing with membranes The information, and, in particular, the recommendations relating to the application and end-use of Sika products, are given Waterproofing works dependant on the basement’s structure are required to prevent the concrete, i. This statement is followed for WATERPROOFING . Exposed or concealed waterproofing membrane on flat or pitched roofs both for new New concrete should be cured for at least 28 days and should have a pull off WORK METHOD STATEMENT Building Line - Waterproofing System Planter Boxes MAPEI: Version: Revision: B06 4/01/2021 2 MAPEI Australia Pty. Polyurethane waterproo ng membrane METHOD STATEMENT FOR FLAT ROOF WATERPROOFING 01 Product Description Conseal 100 CONSEAL 100 is a solvent free, exible acrylic emulsion coating OBJECTIVE This method statement describes a work explanation of the method for carrying out substructure waterproofing works on concrete surface at sites for DEWA substation projects to ensure that during the entire execution stage, the work is done in line with good engineering practices and in compliance with engineering standard practices AQUA BARRIER is a polymer-modified cementitious waterproof slurry composed of a liquid polymer component and a cement-based powder component. 4 Limitations 5 3 Products & System 6 3. view pdf Crack Repair in Xypex Bio-San C500 Treated Concrete. 2 SYSTEM DESCRIPTION SikaProof® A is a fully and permanently bonded, flexible sheet membrane waterproofing system. The products to be used include Masterseal 540 flexible polymer cement waterproofing slurry and Mapeifill GP high-strength Method Statement SikaProof® A+ 17. 2019, Version 01 4/9 2. Notes: New concrete structures need to cure and dry for at least 14 days. The SikaProof® Quicseal 104 is a two component, flexible cementitious waterproofing membrane consisting of a synthetic resin mixed with a blend of selected cement and well-graded fillers. Cementitious waterproofing products are waterproofing barrier, avoiding the passage of water between the two cementitious layers (e. 5 %âãÏÓ 49 0 obj > endobj xref 49 24 0000000016 00000 n 0000001072 00000 n 0000001308 00000 n 0000001569 00000 n 0000001699 00000 n 0000002830 00000 n 0000003411 00000 n 0000003940 00000 n 0000004497 00000 n 0000005041 00000 n 0000005603 00000 n 0000005738 00000 n 0000006728 00000 n 0000007337 00000 n High performance flexible acrylic cementitious waterproofing coating (Formerly SikaTop® Seal-109 hi) DESCRIPTION SikaTop®-109 Seal IN is an elastomeric, liquid applied, Sika Method Statement : SikaTop®-109 Seal IN ECOLOGY, HEALTH AND SAFETY User must read the most recent corresponding Safety Method Statement Sikaplan® WP sheet membrane system for waterproofing of mined tunnels 10/2021, VERSION 02 3/38 1 SCOPE This method statement describes the installation procedure of the Sikaplan® WP 1100 and 2100-series Sheet Waterproofing Membranes and the Sika® AR/DR waterbars made of plasticized PVC for waterproofing of tunnels. It is applied on concrete and brick structures that hold water to avoid water infiltration. Suitable for use in hot climatic conditions. This method statement covers the detailed procedure for installation of Fire Protection Pipes and Fittings. e. For spray application, Sealproof Cementitious Crystallization Waterproofing can be applied with a suitable fine mortar spraying device. Method Statement for Waterproofing System 7. The 2-components of Davco K11 Flex react chemically after mixing to form a hard and elastic film which bonds tenaciously to most concrete or masonry substrate to protect against possible ingress of water. The powders used are small ceramic or silica particles that are mixed with Portland cement to form hydraulic binders. These above and below-grade waterproofing coatings have good affinity to concrete and masonry substrates due to their cementitious nature, and thus strong bonding strength. 0 Method Statement for Waterproofing Treatment for Flat Roofs 1. Surface preparation through cleaning, crack filling and leak repairs. This document provides a method statement for terrace waterproofing and insulation works. Cementitious waterproofing is a critical Method Statement Corporate Construction Basement waterproofing with membranes The information, and, in particular, the recommendations relating to the application and end-use of Sika products, are given Waterproofing works dependant on the basement’s structure are required to prevent the concrete, i. 3. Cementitious Waterproofing Cementitious waterproofing is a hacking method and it is in a type of cement-based of waterproofing. The method commonly used in case of rectangular grooves is to use a flush fitting has an opening at the top for the adhesive to enter and a flange at the bottom that is bonded to the concrete face. Method Statement for Application of Waterproofing Membrane. It Cemcoat Putty remains the responsibility of the Engineer to determine the correct method for any given application. It outlines the purpose, scope, references, definitions, responsibilities, equipment, and procedures for the project. Method Protects against concrete carbonation (80 mils SikaTop Seal 107 is equivalent to 6 inches of concrete). WORK METHOD STATEMENT Waterproofing System – External System Exposed Non-Trafficable Roof Waterproofing Revision: MAPEI: Version: W05 14/12/2017 0 MAPEI Australia Pty. 2 References 5 2. thickness tacking care to cover the whole surface. 1 REFERENCES 1. This is commonly referred to as a saturated surface dry or SSD condition. 1 Project site conditions 5. The document outlines the steps for applying a cementitious waterproofing This method statement describes the step by step procedure for waterproofing of cracks through injection. Welding Procedure for Steel Reinforcement Cages 8. Scope of work. 1 Place three quarters (3/4) of component (A) (liquid) in a suitable mixing container. If further information is required, MBP (NZ) LIMITED recommends referring to the Product TDS, or seeking advice from MBP (NZ Elastomeric cementitious waterproof coating Uses: Nitocote CM210 provides a cementitious, elastomeric waterproof coating with inherent crack-bridging ability. easily on different surfaces (concrete, mortar, brick, ceramics, bituminous membranes, steel, zinc, Aluminum). 180 Viking Drive Wacol, Queensland 4076 Phone: +61-7-3276-5000 PART 1 SYSTEM 1. 3 Ensure the substrate surface is smooth and free from cracks. MS pipe where ever it required from inside & grout each socket with cement slurry mixed with waterproofing cement compound. 0. 2020, V02 4/33 2. Title. It is preserving Method Statement Ref. Prime coat shall be applied with brush or roller in a continuous uniform coating. QA/QC Engineers are required to keep an eye on, verify, regulate, and record the quality of the concrete delivered to the site as well as the Check that new concrete has cured for at least 28 days and has a pull off strength ≥ 1. Work shall be carried out as per the METHOD STATEMENT Shotcrete application directly onto sheet waterproofing membranes 10/2021/ VERSION 02 . 2 DESCRIPTION This method statement describes the flexible sealing of wet cracks, with and without hydrostatic water pressure in reinforced his method statement describes the construction method, sequence and procedure for application of cementitious water proofing system at toilet, kitchens floor & wall (up to 1 OOmm heights) and The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages and activities for Cementitious and Reactive Waterproofing for Floor and Walls of Evaporator pits, Electrical Cable Trenches, Sump Pits and other locations as shown on This document outlines the procedures for applying a cementitious waterproofing coating to wet areas as part of the construction of Elan Townhouses at Tilal Al Ghaf Development by Majid Al Futtaim. The document provides application instructions for waterproofing bathrooms and toilets using a single-layer Cementitious waterproofing is a waterproofing method that uses cement-based coatings to create a waterproof barrier on concrete surfaces. doc / . 35 mm – 0. It may also be used for foot trafficable Imperial College London is developing its campus at White City, 23-acres located on Wood Lane, London. dcp-int. It describes delivery and storage of materials, surface As previously discussed, the waterproofing effective-ness of the above procedures and recommendations is very dependent on the quality and porosity of the CMU or concrete block installed. 2021 , V02 2/34 Table of Contents 1 Scope 3 2 System Description 3 2. It outlines the scope, safety precautions, roles and responsibilities, and step-by Method of Application Note; for more detailed and project-specific application information consult the Polyplus CP method statement. It outlines the following: 1. 1 System components 6 3. 1 SURFACE PREPARATION }}In all environments, remove laitance, loose and damaged concrete, existing coatings and any contaminants which may impair the penetration of the active ingredients. 08. Aquathane R100 (Polyurethane liquid membrane for waterproofing and protection) Page 2 of 11. Wheel barrow Spatula Other Hand Tools etc. Further, installation of Xypex products by a qualified installer, especially for CMU / concrete block waterproofing applications, is highly recommended. Surface Preparation • Roof slab must be of sound concrete and honeycomb should not be formed. Repair Elevator Pits and Other Below Grade Concrete Method Statement HYDROSTATIC PRESSURE - ACTIVE LEAKING WATER HYDROSTATIC PRESSURE - ACTIVE LEAKING WATER Here is the method statement for application of waterproofing membrane. Safety precautions are also described. 1. Applicable for Drinking water tank, waterproofing solution by coating and jointing. The waterproofing will involve primer application, two coats of the liquid material, This document provides a method statement for installing a waterproofing membrane. The materials which are used for waterproofing of concrete are easily available in Polymer-modified, flexible, cementitious waterproofing coating. This document provides a method statement for roof waterproofing works. It can be exposed or under protective layer Civil Method Statements (85) Electrical Method Statements (47) Fire Fighting Systems (19) HVAC Method Statements (45) Occupational Health and Safety (29) Oil & Gas Systems (20) Plumbing Method Statements (41) Technical Guides Learn how to apply Xypex, the best concrete waterproofing additive, Dryshake products and coating, with our step-by-step installation guides. 2 REFERENCES . SATIP-M-100-02 : Waterproofing of Roof Slabs Building Code %PDF-1. Cold applied primer IMI CONCRETE PRIMER is applied on the prepared wall surface at the rate of 250-300g/M 2 This method statement outlines the procedures for substructural waterproofing works for a project involving external landscaping, irrigation, parking, and services in Lusail Al Daayen Area, Qatar. Obtain necessary clearances and approvals from engineers including MEP clearance for existing and required underground utilities. Where alternative methods are to be used, these must be submitted to for This is the Method statement for waterproofing coating to Potable Drinking water tank using Sikatop Seal 107 – a Sika’s product. On stable, sound and well prepared concrete surfaces, Waterproof 360 PU, diluted 5% with Xylene may be used as primer. 2 SYSTEM DESCRIPTION Sika BentoShield MAX LM is a self-healing waterproofing membrane that’s resistant to contaminated soils, forming This Method Statement describes the in-situ adhered, cold-/post-applied, fully bonded SikaProof® P-1201 sheet membrane waterproofing system. 16 If a plaster or cement render is to be applied on the bitumencoated surface, a third coat is recommended to - Super Thoroseal PDS - Free download as PDF File (. A water based, fast drying, flexible ; two component, polymer modified, cementitious waterproofing membrane designed for under toppings, tiles and other protected environments. 6 OSMOTIC CEMENTITIOUS MORTAR – SCUM GUTTERS, IF REQUIRED A. Usually This method statement describes the step by step application of 1-component component, liquid applied, rapid cure, pure polyurethane roof waterproofing membrane for exposed roof. This video shows the step-by-step installation technique for applying Mapelastic High Flex on balconies, planter boxes, bathrooms, wet rooms, kitchens, stora waterproofing applications where the membrane is to be covered over with tiles, screeds or concrete beds. docx), PDF File (. Polyboard – Bitumen Impregnated Compressible Fiber Filler Board 5. Brittle substrate shall be primed with Waterproof 310 PU PRIMER. 1 SikaProof® A+ pre-Applei d Waterproofing System 4 2. Pre-batched components - mixes and applies easily The document provides a method statement for waterproofing structures below ground level such as sump pits and lift pits for the Negombo Grand Beach Hotel project. Cementitious products are probably the easiest waterproofing materials to use. It proposes using Penetron admix in the concrete, Penetron slurry on The document provides a method statement for waterproofing toilet floors and walls at a new poultry processing unit. Moreover, MAPELASTIC TU SYSTEM is characterized by high flexibility, which allows stretch and deformation, guaranteeing the SikaTop®-107 Seal HK is a two part polymer modified cementitious waterproof slurry composed of a liquid polymer and a cement based mix incorporating special admixtures. It outlines the objective, scope of works, applicable documents, preparation, control measures, responsibilities, work This document provides a method statement for roof waterproofing works for Project No. • APPLICATION: Apply mortar with a brush or trowel in a minimum of 3 coats. 75 mm: Total consumption: Cementitious substrates: Method Statement Sika® BituSeal T-130 SG for Concrete Roof Edition: 10 /201 8 2/4 1 SYSTEM DESCRIPTION Installation of Sika® BituSeal T-130 SG bituminous waterproofing membranes, torch-on sheet. Applying a liquid waterproofing membrane to USES: WATERPROOFING FOR WASTE WATER TANK SIKA LIMITED (VIETNAM) Method Statment Sika® Poxitar F Date: 09/2018 2/5 1 SCOPE This method statement describes the step by step procedure for application waterproofing system 4. g. Water proofing is required for many areas like basements, sunken portions, roofs, terrace gardens and expansion joints etc. The scope of work section This method statement describes the step by step procedure for installing the Sika BentoShield Max LM range of products for use in below ground waterproofing structures. Maris Polymers SA recommends adhesion tests prior to bidding the project to ensure adhesion and compatibility between the coating and the substrate. Super Thoroseal forms a water vapor permeable yet waterproof barrier that bonds integrally to the page 04 3. It consists of an Stop tank methodology Cementitious waterproof coatings are typically two-component blends used behind tile, over masonry patching, and over concrete surfaces. Ltd. Execution - Mixing and Application 2. AQUA BARRIER cementitious waterproof mortar slurry comprising of a liquid polymer and a cement based mix incorporating special admixtures. NOTE: Prior to the application of the waterproofing membrane: Junctions Option A: Apply a bond breaker/tape with MAPEBAND (337-3- Method Statement: A written document that gives specific instructions on how to safely perform a work-related task, or operate a piece of Plant or equipment. When the components are combined and applied, a flexible elastomeric membrane is formed. Check that the surface is dry and substrate humidity is maximum 4% without emitting dampness. . #: DCP00/ 08-0008-A-2022 www. Typical applications include: Method Statement Safety Datasheet (Powder component) Safety Datasheet (Liquid Component) ( 0 ) Customer Reviews. 3 Method Statement: The product shall be applied as per the guidelines given below. Waterproofing materials as per approved material submittal; 50mm thick concrete blinding under manhole foundation: Following equipment and tools will be used as required during Roof Waterproofing System. 5mm Self Smoothing . Scope: Potable water concrete tank internal surface waterproofing with polymer modified cement based mortar. The scope of work which is the waterproofing treatment of these structures at CLASSIFICATION: 09 34 00 Waterproofing-Membrane Tiling PRODUCT TYPE: Polymer Modified Cement (Waterproofing) PRODUCT DESCRIPTION: LATICRETE® HYDRO BAN® Cementitious Waterproofing Membrane is a one component, polymer fortified, cement based waterproofing material that mixes with water. Waterproofing Structures Installed Below Ground Level 2. 2. 224020 - Mirfa 2 RO Plant. The application of Davco K11 Flex requires the surface to be saturated or wetted down prior to its A properly cured floor will give a watertight concrete or cement floor. For maximum spray pattern it should be possible to adjust (Refer to Method Statement for detailed application). 04. Back to Construction Solutions Cement slurry Injection for filling void. Procedure also defines the method used to ensure that the pipe work and fittings installation has been carried out as per the This method statement describes the construction method, sequence and procedure for application of cementitious water proofing system at toilet, kitchens floor & wall (up to 1 OOmm N°: 13 Author: Technical Department Date: 03. Primer: It is a cold applied, general purpose roofing primer, formulated with highly pliable, flexible A constant monitoring and supervision duty shall be undertaken by main contractor to ensure work activities are carried out in accordance with the method statement. SikaTop® Seal-107 (MY) is a two part polymer modi- Method Statement "Application of Cementitious Wa-terproofing mortar/slurry to Wet Rooms". com) or contact Xypex’s Technical Services Department or your local Xypex Tech-nical Services Representative for more information. Any irregularities shall be immediately actioned. #: DCP00/ 08-0022-A-2021 www. The document provides a detailed method statement for waterproofing treatment of vertical and horizontal surfaces in areas like bathrooms. USES Interior and exterior waterproofing and damp-proof-ing of concrete, cementitious rendering, brickwork and blockwork This method statement outlines the process for applying a liquid applied bituminous waterproofing to concrete surfaces at a car park building project in Riyadh, KSA. It is applied to concrete and masonry water retaining structures to prevent water infiltration. Method Statement for Blinding Concrete 6. shotcrete-membrane-shotcrete, shotcrete membrane-poured concrete, etc. secondary lining) 1. It consists of an The application method of cementitious waterproof coating. PROCEDURE FOR WATER PROOFING: STORAGE AND HANDLING OF MATERIALS: Materials shall be stored in a cool Waterproofing is the process of making an object or structure waterproof or water-resistant so that it remains relatively unaffected by water or resisting the ingress of water under specified conditions. – Remove only defective concrete as instructed. Generally there are two types of waterproofing This document provides a method statement for waterproofing underground sumps, STPs, storm water sumps, and collection tanks. They're readily available from suppliers of masonry products, and they're easy to mix and apply. 3 SEALING SECOND POURS, STRUCTURAL JOINTS, COMPONENTS FOR • protection and waterproofing of the external parts of the structure; • sealing second pours and components for The document provides a 16-step method statement for waterproofing a toilet or sunken area. It is applied to concrete and mortar to prevent water infiltration. Improves concrete/masonry appearance. It involves several steps: 1) Surface WORK METHOD STATEMENT Installation of Tiles Direct to a Concrete Substrate MAPEI: Version: Revision: C02 14/12/2017 1 MAPEI Australia Pty. It is applied in two coats at a thickness of 1-1. Method Statement PDF - 370 KB (en) Sikafloor®-263 SL HC - 1. After curing period, fix 20 mm dia. Separation Layer – Geotextile Filter Membrane (Outsource) 4. Key steps include: cleaning and preparing the floor surface; fixing plumbing pipes with a 10mm gap from concrete; grout filling the core area with This method statement describes the step by step application of waterproofing mortar for swimming pool using Sikalastic®-1 KMY underneath tiling work. Usually, coatings last about 15 years. Any surface imperfections shall be repaired using a suitable cementitious repair mortar. This is modified bitumen, reinforced with polyester non-woven fabric. 06. 5 For efficient waterproofing, it is recommended to apply two coats of Bituproof 3. Do not apply cementi-tious waterproofing materials when the This civil work method statement describes the brief procedure and responsibilities of site personnel who are involved in the work for protection screed of waterproofing membrane. ii. thick. It describes the preparatory work of cleaning and Introduction. primary lining), waterproofing system and in-situ concrete (i. Polyflex Combo – Acrylic Modified Elastomeric Cementitious Waterproofing and Protective Coating 3. The purpose of this Method statement is to define the procedure for Swimming pool, finishes + Waterproofing and its related activities necessary to complete the work, in order to ensure that all the works are SEALPROOF CEMENTITIOUS CRYSTALLIZATION WATERPROOFING (CW) is a crystalline waterproofing formulation of selected blends of cement, fine quartz sand and active chemical constituents (Method : ASTM C267) _____ Technical Data Appearance Light Cementitious Grey Workability @ 23°C 30 minutes VOC 0 g/L Setting Time @ 23°C 2-3 hours AQUA BARRIER is a two-part polymer modified cementitious waterproof slurry comprising of a liquid polymer part and cement-based powder part. 3 Selection of SikaProof® A+ membrane system 5 2. Title Method Statement for Application of Waterproofing Membrane 2. Leave a Review WORK METHOD STATEMENT Waterproofing System – External System Pedestal/Floating Systems Revision: MAPEI: Version: W06 1. Cementitious waterproofing typically features ease of application, durability, and resistance to harsh environmental conditions. 2 OPTIONS FOR SECONDARY LINING Method Statement SikaProof® A+ 12. Cementitious waterproof coating being applied. It consists of a flexible polyolefin (FPO) membrane containing a unique hybrid polyolefin (FPO) based bonding layer. SikaTop®-107 Seal KH suitable for drinking water, wet room and swimming pool system. Cementitious waterproofing is the easiest method of waterproofing in construction work. Method Statement SikaProof® A+12 05. 5 N/mm2. Sikalastic®-560 GCC is a cold-applied, one-component waterborne liquid applied waterproofing membrane, highly elastic and UV-resistant. The information, and, in particular, the recommendations relating to the application and end-use of Sika products, are Method Statement SikaProof® A+ 17. 10. Cementitious waterproofing is the easiest method of Here is the method statement for application of waterproofing membrane. IMPORTANT CONSIDERATIONS SikaTop® Seal-107 (MY) is not a decorative treatment QUICSEAL 104 is a two component, flexible cementitious waterproofing membrane consisting of a synthetic resin mixed with a blend of selected cement and well-graded fillers, smooth slurry and easily applied by brush, roller of suitable spraying equipment Removal of loose concrete cover- with hammer drill and hammer and chisel – Remove tire wires, nails etc. B = 3 : 1. This 1. It consists of a cross-laminated PE film and two modified bitumen layers covered with transparent Method Statement SikaProof® A 11. Theoretical Coverage Concrete Slab: 1-1. 2 SYSTEM DESCRIPTION SikaProof® A & P are fully and permanently bonded, flexible sheet membrane waterproofing systems designed to waterproof basements and other below ground structure. Available in concrete gray and off-white. 2021, Version 5 2/12 TABLE OF CONTENTS This method statement describes the structural (= force transmitting) crack repair of dry, wet and even oily cracks Sometimes the concrete surface is hidden under a surface of mineral deposits left from long-term water leakage. Bio-San C500 Specific Details. SSD concrete will not absorb any more This method statement describes the procedures for installing a waterproofing membrane on underground concrete for a project in Jubail, Saudi Arabia. Osmotic cementitious mortar suitable for contact with drinking water, for rigid waterproofing masonry and concrete structures. It outlines the materials, manpower, tools, surface preparation procedure, and application process for a PU-based waterproofing material. It outlines the scope of work, health and safety considerations, organization and responsibilities, and workforce. It outlines the roles and responsibilities of the project team, including the Project Director, Project Manager, Site This method statement for fireproofing works describes the construction and control actions to be done to meet the requirements for lightweight concrete fireproofing works on structures and equipment skirt/support. It details the materials needed including acrylic waterproofing, bituminous systems, sealants and primers. 2018, V04 No. 2021, V02 020720301000000015 4/32 2. It can be exposed or under protective layer This document provides the method statement for applying Greenseal Flexi 201, a flexible cement-based waterproof coating, to surfaces like planter boxes, gardens, and balconies. 2 Storage conditions / shelf life 8 The method also describes an integral cement treatment using a brick bat coba layer between base coat and finishing protective coat reinforced with fiberglass mesh. 2 Storage conditions / shelf life 8 This document provides a method statement for applying a waterproofing system. 1. xypex. The procedure involves surface preparation, crack injection, coving installation, and applying two NEGATIVE SIDE WATERPROOFING OF BELOW GRADE CONCRETE It is very common to use Xypex products, installed on the negative side, to stop water leakage through concrete. Cementitious waterproofing slurry and protective coating DESCRIPTION Previously known as SikaTop® Seal-107. Purpose and scope. 2) Testing the substrate by ponding water for 48 hours The Project QA/QC Manager and Engineers are responsible for ensuring that the Construction Team adheres to this Method of Statement for Protection Screed of Waterproofing Membrane and follows the site inspection procedures. cementitious concealed waterproofing system. – Do not reduce structural integrity. Selected working area should be 1. Search for: Select a Method Statement. IDROSILEX PRONTO (306-4-2014 GB) [Also known as PLANISEAL 88] 1. 1 Existing Roof!! Evaluate site and building conditions. Method Statement Sika® BituSeal T-130 SG for Concrete Roof Edition: 10 /201 8 2/4 1 SYSTEM DESCRIPTION Installation of Sika® BituSeal T-130 SG bituminous waterproofing membranes, torch-on sheet. Our solutions include waterproof membranes, waterstops, joint The document provides a method statement for substructure waterproofing works for a 132/11 kV substation project. 201 Polito Avenue Lyndhurst New Jersey 07071 United States of America phone +1 (201) 933-8800 fax +1 (201) 804 1076 From deep below ground to high above it, Fosroc delivers a full range of world-class waterproofing systems that ensure the integrity and durability of concrete structures. Any irregularities shall be immediately The concrete age should be at least 28 days to start waterproofing. SikaTop® Seal-109 MY is a cementitious, two-part, polymer-modified flexible waterproofing coating. • Soundness of roof slab should be checked with rubber or hard nylon hammer and unsound concrete and cracks on the concrete surface to be properly treated with polymer modified Method Statement SikaProof® A+ 16. When mixed, Quicseal 104 becomes a smooth slurry and is This document outlines the work method statement for toilet waterproofing. The key steps include: 1. This method of waterproofing does not require highly skilled labor As per the tests, no leakage must be observed after 24 hours. This type of waterproofing can be easy, and it is a conventional method to provide protection for structure and surfaces, preventing water penetration and waterproofing the structure. Method Statement PDF - 375 KB 1. Such items may be used in wet environments or underwater to specified depths. Method Statement Sika® Crack Injection, structural 30. Super Thoroseal is a cement-based waterproofing coating for concrete and masonry. METHOD STATEMENT Figure 1: Standard build-up for double-shell tunnels composed of shotcrete (i. 2 PROTECTING AND WATERPROOFING STRUCTURES page 10 3. Cementitious Waterproofing . The enabling works package, currently under delivery by Careys as principal contractor, includes a new bridge over the adjacent LUL 1. Please refer to ‘’Floor Surface Evaluation & Preparation’’ method statement. Please refer to Method Statement: Dry film thickness: Approx. Mixing ratio: comp. Sika Corporation. Types of Concrete Waterproofing 1. If you plan to use this Method statement of Bathroom Waterproofing - Free download as PDF File (. well shafts, service pipes The purpose of the method statement for application of waterproofing is to prevent the water to percolate or penetrate into any underground concrete members. Waterproof protection of concrete structures including tanks, basins, pipes, swimming pools Waterproofing external wall surfaces to be backfilled in the ground Method Statement SikaBit® W -15 for Concrete Roof Edition: 0 9 /201 8 2/3 1 SYSTEM DESCRIPTION SikaBit® W-15 is a double-sided modified bitumen waterproofing membrane for wet-application. It involves preparing the surface, applying primer, laying two layers of modified Method Statement Sika® BituSeal T-130 SG for Concrete Roof Edition: 10 /201 8 2/4 1 SYSTEM DESCRIPTION Installation of Sika® BituSeal T-130 SG bituminous waterproofing membranes, torch-on sheet. Apply a second coat not less than 6 mm. 1 Application temperature The waterproofing system should be applied at tempera-tures between +5° C and + 30° C. TECHNICAL DATA: Consistency of mix: plastic-trowable. The purpose of this method statement is to describe the measures and ways of the proper application of waterproofing membrane in our project. It outlines the materials, equipment, responsibilities, procedures, quality control, documentation, and safety aspects for applying a two-coat elastomeric waterproof coating system to the tank. Pot life of mix: approximately 1 hour. Method-Statement-for-Cementitious Waterproofing of Elevator pit - Free download as Word Doc (. com . Work shall be carried out as per the Method Statement for Civil works for Swimming Pool. Responsibilities are assigned to various Material Specifications for Method Statement for Roof Waterproofing Application System: Approved Materials: 1. It describes the purpose, scope, materials, Scope: Potable water concrete tank internal surface waterproofing with polymer modified cement based mortar. 850 74 02 3/41 1 SCOPE This Method Statement describes the system and installation procedure of the SikaProof®A membrane waterproofing system. They must be tested for hardness because they vary from state to state, country to country. A constant monitoring and supervision duty shall be undertaken by waterproofing subcontractor to ensure work activities are carried out in accordance with the method statement. Wetting Concrete Xypex requires a saturated substrate and a dry surface. pdf), Text File (. SikaTop® Seal-107 (MY) is a two part polymer modified cementitious waterproof mortar slurry comprising of a liquid polymer and a cement based mix incorporating special admixtures. It involves 3 steps: 1) Surface preparation which includes cleaning, checking for leaks, and plastering. This method is freestanding and commonly applied with a brush or trowel. 05. Waterproofing Systems Roof Systems Protect. Cementitious Waterproofing. 1 REINFORCED CONCRETE BATHS AND POOLS: SPECIFICATIONS FOR CONCRETE page 07 3. It is applied to concrete and mortar to prevent water Method Statement Ref. 2004 Method Statement for Application Method Statement WATERPROOFING FOR CONCRETE ROOF SLAB (NONINSULATED, PANEL FINISH) Scope: Application of polymer The method statement for waterproofing is the work procedures and means of controlling specific health and safety risks involved in installing the waterproofing system composed of keyed pre-formed sheet waterproofing applied below the WORK METHOD STATEMENT W04 Waterproofing System – External System Waterproofing Planter Boxes MAPEI: Version: Revision: 29/08/2018 1 MAPEI Australia Pty. Search. Technical Design Waterproofing It is essential to water proof a structure to prevent the seepage or penetration of water for its durability. It describes preparing the surface by cleaning it and filling This document provides a method statement for waterproofing retaining walls with Masterseal 540 (Barralastic). A: comp. Two component, high flexibility cementitious mortar (with crack-bridging capacity >2 mm) applied by trowel or roller for waterproofing balconies, terraces, bathrooms and swimming pools. method statement method statement for application of waterproofing membrane victor hu victor hu manager of sinomaco published dec 2020 follow the purpose of the. docx - Free download as Word Doc (. 5mm each using a brush, broom, or spray equipment. 1 SikaProof® A+ PRE-APPLIED WATERPROOFING SYSTEM SikaProof® A+ is a fully and permanently bonded, flexible sheet membrane waterproofing system. When mixed together and applied it cures to a flexible elastomeric membrane. 3 Saturate absorbent concrete surfaces thoroughly with water to achieve a surface saturated dry (SSD) condition. b. HSE General . Wet Cementitious Waterproofing; Liquid Waterproofing Membrane; Bituminous Membrane; Bituminous Coating; Polyurethane Liquid Membrane; 1. LIQUID APPLIED POLYURETHANE WATERPROOFING MEMBRANE USING MAXSHIELD® PF 900 The purpose of this method statement is to define the procedure for the construction of manhole in accordance with the requirements specified in the relevant project specifications and drawings. Screed Concrete – Protective Fiber Reinforced Screed Concrete (Outsource) 6. 09. Section 1: Summary Basic Method / Product Threshold Yes No METHOD STATEMENT FOR DAMP PROOFING AND PROTECTION AGAINST RISING WATER DAMPNESS*-NEW CONSTRUCTION *Efflorescence is the resultant effect of rising water dampness Concreting with Integral Waterproofing compound: Mixing & Application • Place cement and aggregates into the concrete mixer as per the mix design, mix in dry state. 2 The irregular/ broken edges shall be repaired using fibre reinforced cementitious repair mortar BS 5F or epoxy resin based putty MAXTREAT® EPG. 4 kg/ m2 at 1 coat such cases, a cementitious waterproof coating such as This method statement is offered by DCP as a ‘standard proposal’ for the application of . 3. 24 // 12 Substrate preparation 5. ). The Method Statement for Swimming Pool establishes the procedure for construction, finishes, and waterproofing, along with their associated activities required for project completion. 1 SIKAPROOF® A+ PRE-APPLIED WATERPROOFING SYSTEM SikaProof® A+ is a fully and permanently bonded, flexible sheet membrane waterproofing system. Waterproofing is the formation of an impervious barrier that is designed to prevent water from KÖSTER Method Statement // MS W POOLS 02. Easy to apply by brush; Approved to be in contact with Method Statement SikaProof® A 11. Filling Tie Holes in Xypex Bio-San C500 Concrete. sxbt ddvtnkta vvwoez eksmw ossv fzckzf siv tcb nsszitc udmi